CFA Piled Reinforced Concrete Raft with Heave Protection and all Groundworks up to DPC at Ramsey St Mary, Cambridgeshire.

  • Site was cleared and set-out.
  • 25no 300mm Augered Piles varying between 8-12m were installed.
   